• Deactivating the Independent Analog Switchboard System Used in 20 Different Units, instead of the Rope Switchboard System, where All Units can be Managed from a Single Point; Transition to approximately 1000 Internal and Central Rope Radio Systems was Successfully Provided.


• Personnel Attendance Control System was renewed in all my units.


• Network infrastructure in the important units of the institution; Cabinet Design, Patch Panel Design, Keyston Jack Replacement, Labeling and Professional Test Equipments have been renewed from end to end.

let's study together!

Need a Project?

Check Out Our Services